Quote:
Originally Posted by Besoeker
For an installed capacity of 120,000 MW of wind power, an output of 40,000 MW would be about par for the course.
|
Do you mean an output of 40,000 MWh per annum or a peak output of 40,000MW or am I being dumb not understanding?
__________________
'There are only two ways to live your life, accept things as they are or take responsibility for changing them' Bhagat Singh (even if you don't agree with how he chose to apply this philosophy)
"Just ignore it all" {CT}
|